




After a big meeting with Nazim and Hasan G. on Friday we have decided upon the layout of the house gardens and terrace (though we've decided nothing for the 7m or 20ft strip between the basement level and the lower house). On Saturday we went up to check out the built-in wardrobes were getting on. Very well as it happens. At the house most of the glass is in and the landing banister has been done. At the pool level we weren't happy with the awkward angle between the pool and the basement stairs. And Nazim agreed so they are being re-done. He also agreed on the need for a bar in the circular terrace. The big news is that today they have started on the plot on the other side of the road. Nobody knows who's building yet, but they started clearing the plot this morning.
No comments:
Post a Comment