Monday, 20 November 2006

Ground Zero





Everything hangs on the wooden floors being installed. This should start happening tomorrow. In the meantime they have started work on the laundry room covered terrace. Inside nuch cleaning and painting continue, plus the air-con units (all 10 of them) are being installed. In the lounge Alison inspects the pile of wood that will become the bookshelves and desk in the study-area.