Thursday, 28 September 2006

Outside Stone Tiling







Nazim and the team and we discuss the steps into the pool. Air-con cabling is installed. The rach near the children's lounge is taking shape. And the Ida stone has made it outside and onto the bedroom balconies.

No comments: