As well as on the ongoing tiling and stone-cladding a number of new jobs have started...
The damp-proofing of the terrace area.
All the ceramics for the bathrooms have arrived on site.
They are installing the built-in cisterns in the bathrooms.
The gas pipes for the 2 kitchens are being installed.
The raised platform for the open-plan bathroom in the main bedroom has been done, including the space under the wardrobe for the hidden safe).
Plus (not pictured) the drain for the pool shower has been installed (so that shampoo and soap doesn't kill the garden).