Friday, 10 March 2006

The first concrete..



..went in yesterday afternoon. Four lorry-loads were poured back-to-back into the lower level to make the floor for the basement level. In the basement there will be a small one-bedroomed flat, another separate bedroom with it's own terrace, a storage room, a water depot and the pool machine room. Steps down to the basement level will start near the "back" door (facing the road, as does the front door. The chap has a remote control that moves the concrete-pouring-pipe